Shout-Out
November 5, 2026

Crew Catches Misrigged Counterweight Before the Lift

A rigging crew was assembling an all terrain crane. After attaching the rigging to a counterweight, the crew made a final inspection before lifting.

During that check, they discovered the rigging was not set on the lifting lug. The crew stopped the lift, reset the rigging, and continued without incident.

Shout-Out

Great job to the team for double-checking the rigging and avoiding a dropped load incident. The final inspection before the lift is there for exactly this reason, and this crew used it the way it was meant to be used.

Report this post

Comments

No items found.

Add a comment

Comments are reviewed by the CSA safety team before they appear, within 48 hours.

Thanks. Your comment will appear after review, within 48 hours.
Something went wrong posting your comment. Please try again.

Report this post

Tell us if this post names someone, is about an open investigation, or breaks the posting guidelines. Reports are reviewed within 24 hours.

Thanks. The CSA safety team will review this post within 24 hours.
Something went wrong sending your report. Please try again.

Got a story like this?

Share a near miss, a hard-earned lesson, or a crew that got it right.

Share your story

How posting works

1
Share your story using the form. Your name is optional.
2
The CSA safety team reviews it within 48 hours.
3
Approved stories go live on Field Stories.