Real lessons from the people who run the lifts. Share a near miss, a hard-earned lesson, or a crew that got it right, so the next crew goes home safe.
A final pre-lift check caught counterweight rigging that wasn't set on the lifting lug. The crew stopped, reset it, and finished the lift without incident.
Read storyA crew was booming up a telecrawler when the hoist cable became caught between two cable guides on a boom section. As the boom continued to raise, tension in…
Read storyDuring installation of a 10-ton cheek counterweight, a rigging crew used two 20-foot nylon slings to lift the counterweight from a trailer and position it at…
Read storyA forklift moved a structure into a hoist travel path and the contact was not immediately reported.
Read storyA radio malfunction during a wire rope inspection resulted in a command not reaching the crane operator and subsequent damage to the wire rope.
Read story