A crew was booming up a telecrawler when the hoist cable became caught between two cable guides on a boom section.

As the boom continued to raise, tension increased on the trapped cable, causing visible damage to the hoist cable and minor damage to surrounding components. Operations were stopped after the condition was identified, and no injuries were reported.

The investigation found that the keeper pin for the wire rope was not in place. The identified root cause was a lack of an adequate pre-operational visual inspection, which allowed the missing keeper pin to go unnoticed before operation began.

What Was Learned

Pre-operational inspections are an active barrier against equipment incidents, not simply a paperwork requirement.

Small components such as keeper pins and retention devices can prevent much larger events. Critical rope-routing and retention components should be visually verified before equipment movement.

The lesson: small components can control major hazards. Inspect before you operate.

Report this post

Comments

No items found.

Add a comment

Comments are reviewed by the CSA safety team before they appear, within 48 hours.

Thanks. Your comment will appear after review, within 48 hours.
Something went wrong posting your comment. Please try again.

Report this post

Tell us if this post names someone, is about an open investigation, or breaks the posting guidelines. Reports are reviewed within 24 hours.

Thanks. The CSA safety team will review this post within 24 hours.
Something went wrong sending your report. Please try again.

Got a story like this?

Share a near miss, a hard-earned lesson, or a crew that got it right.

Share your story

How posting works

1
Share your story using the form. Your name is optional.
2
The CSA safety team reviews it within 48 hours.
3
Approved stories go live on Field Stories.