A crane crew was conducting a wire rope inspection that required communication between personnel while the rope was being spooled.
Radios were being used to communicate commands during the operation. During the spooling process, the radios malfunctioned and a command was not received by the crane operator. Wire rope damage resulted.
Work was stopped, appropriate personnel were notified, and the radios were subsequently tested and determined not to be operating properly at the time of the incident.
What Was Learned
Critical crane activities should not rely on communication equipment without considering how operations will be stopped if communication is lost.
Before operations begin, crews should verify the communication method and discuss what will happen if communication becomes unclear or fails. When a required command is not received or understood, movement should stop until positive communication has been restored.
This event demonstrates an important principle applicable across crane operations: loss of communication should result in loss of movement, not an assumption about the intended command.